Installation Overview Prepare the Gate and Power Source –
Ensure gate is level, moves freely, and AC power is available. Mount the Operator –
Secure the Ram 302 AC to a concrete pad or gate post, aligning the drive arm for full range of motion. Connect Swing Arm and Brackets –
Attach the drive arm to the gate using provided brackets, ensuring smooth pivot operation. Install Seco-Larm Photo Cell –
Mount sensors on opposite sides of the gate opening, wiring to the safety input terminals. Wire Control Board –
Connect power, receiver, and control accessories according to labeled terminals. Adjust Limit Switches –
Set open and close limit cams to stop the gate precisely at each end. Test and Finalize –
Restore power, test safety functions, remotes, and smooth gate motion before sealing enclosures.